Pet Products Reflective Large Dog Leash Nylon Rope Pet Running Tracking Leashes Long Lead Dog Mountain Climbing Rope Accessories

$10.97

Clear
SKU: N/A

Description

  • Type: Dogs
  • Material: Nylon
  • Brand Name: pet joy life
  • Feature: Reflective,Breakaway,Quick Release
  • Dog Leash Type: Basic Leashes
  • Type: Leashes
  • Season: All Seasons
  • Pattern: Striped
  • Model Number: NSW18023
modname=ckeditor

Name: Reflective Dog Leash Nylon Rope Pet Running Tracking Lead Dog Mountain Climbing Rope

Suit For: Medium Large Big Dog

Length: 150cm

Feature: Durable/Heavy Duty

  • SAFETY FOR YOUR DOG
  • STRONGER THAN THE REST: Our leash is made of the STRONGEST ROPE
  • GREAT FOR TRAINING, WALKING OR RUNNING

 

 

downloadedPhotos36020190302183326564HTB1EyBXJG6qK1RjSZFmq6x0PFXadHTB1odE6JCzqK1RjSZFLq6An2XXap

 

 

 

Additional information

Color

Black, Blue, Green, Pink, purple, Red

Size